Cetified B Corporation

It's B Corp month 🌍

We are proud to be a Certified B Corp, which holds us to a high social and environmental standard

Abbots Avenue West

Client
Morgan Sindall
Project
Refurbishment
Sector
Residential
System categories
Bitumen Waterproofing Systems
Accredited installer
HTR Building Services Ltd
Aerial view of brick residential building with grey roof surrounded by houses, gardens, and trees in suburban neighbourhood.

Project Overview

The refurbishment of the Abbots Avenue West project presented a unique set of challenges. Due to the severity of its existing roofing issues and its status as a live building with residents in situ, all parties involved needed to utilise their expertise and new technology to ensure work was completed swiftly, and to the highest standard.  

Aerial view of large brick school building with dark roof, surrounding car parks, residential houses, and green spaces.

Complexity

Axter worked closely with St Albans Council and Morgan Sindall, navigating a rigorous vetting process to be awarded the framework. Following the successful bid, an exhaustive roof survey was conducted, which included core sampling and moisture mapping. These assessments revealed extensive failures in the waterproofing system, water saturation in the build-up components, and thermal inefficiencies that required immediate remediation. The project demanded a complete roof strip and the installation of Excel reinforced bituminous membrane system and tapered PIR insulation system.  

Additional complexities arose from coordinating work in a live environment, requiring enhanced safety protocols and a quick completion of works whilst retaining high standards. With residents in-situ, it was vital to minimise the dust, noise, and waste, throughout the refurbishment process.

Solutions

Axter and HTR Building Services Ltd demonstrated exceptional workmanship throughout the Abbots Avenue West project. The installation process was meticulously planned to minimise disruption to residents and ensure quality at every stage. The roof was stripped down, with careful removal of compromised materials and precision installation of the new roofing system including Excel reinforced bituminous membrane system and tapered PIR insulation system.  

Unexpected weather conditions played their part throughout the project. With the already strict time-restrictions in place (with residents in-situ), this meant any delays to the project could cause further inconvenience. Meticulous planning meant undisrupted days were incredibly efficient, resulting in the project completing before the original deadline.

Aerial view of residential street with grey rooftops, green gardens, parked cars, and tree-lined roads forming grid pattern.
Aerial view of brick residential building with grey roof surrounded by houses, gardens, and trees in suburban neighbourhood.

Download the Abbots Avenue case study PDF

Download

Accessibility Settings

Text

Applies the Open Dyslexic font, designed to improve readability for individuals with dyslexia.

Applies a more readable font throughout the website, improving readability.

Underlines links throughout the website, making them easier to distinguish.

Adjusts the font size for improved readability.

Visuals

Reduces animations and disables autoplaying videos across the website, reducing distractions and improving focus.

Reduces the colour saturation throughout the website to create a more soothing visual experience.

Increases the contrast of elements on the website, making text and interface elements easier to distinguish.