Accessibility Settings

Text
Use dyslexic-friendly font Applies the Open Dyslexic font, designed to improve readability for individuals with dyslexia.
Use readable fonts Applies a more readable font throughout the website, improving readability.
Underline links Underlines links throughout the website, making them easier to distinguish.
Adjust text size (%) Adjusts the font size for improved readability.
Visuals
Use reduced animations Reduces animations across the website, reducing distractions and improving focus.
Use calm mode Reduces the colour saturation throughout the website to create a more soothing visual experience.
Use high-contrast mode Increases the contrast of elements on the website, making text and interface elements easier to distinguish.
B corp logo white
We are celebrating B Corp Month this March at Axter

Every March the global B Corp community come together to celebrate what it means to be a B Corp.

Manchester City Centre

Crown Street Primary School

Project type
New Build
Project sector
Education
System categories
Hot Melt
Accredited Installer
NRA Roofing & Flooring Services Ltd
Crown street school

Systems in use

  • Wilotekt®-Plus

    The original and industry renowned second generation hot melt system. Unique structural waterproofing designed and manufactured for use on all inverted roofs, podium decks, living roofs, blue roofs and car park decks.

A Multifunctional Rooftop for Manchester’s First City-Centre School in 20 Years

Crown Street Primary School marks a milestone for Manchester – the first school to open in the city centre in over two decades. Positioned in a densely built-up area surrounded by towers rising to 51 storeys, this four-storey educational facility redefines urban schooling with its standout feature: a multifunctional rooftop playground. It’s the first rooftop school play area seen in Manchester since the early 1900s and reflects a global trend towards smart, space-efficient urban design.

The rooftop spans 500m² and includes a resin-bound gravel area, a rubber-floored playground, and an artificial turf football pitch. Each area demanded a high-performance roofing system capable of enduring constant use while maintaining thermal and waterproofing integrity.

Systems Built for Performance

To meet the ambitious design and durability requirements of this rooftop, Axter supplied a robust build-up featuring:

Wilotekt-Plus: A second-generation structural waterproofing system, ideal for inverted roofs. Known for its durability and versatility, it provided a seamless waterproofing layer beneath the rooftop amenities.

Hytherm ECO XPS: High compressive strength insulation delivering thermal efficiency and structural integrity. With a U-value of 0.20 W/m²K, it comfortably met energy performance requirements while supporting significant rooftop loads.

IMG 1742

Image 5

Meeting Complex Urban Challenges

The tight city-centre site presented significant challenges. With construction of two high-rise buildings underway adjacent to the school and a 3,000m² podium space to coordinate with, logistical planning was critical.

The roof itself was constructed over a true zero-fall concrete slab, with a minimum fall of 1:80 to ensure effective drainage. This Zero-Fall Design required meticulous planning and execution to maintain both visual alignment and waterproofing performance. Multiple rooftop finishes added further complexity, with each material requiring specific substrate preparations and performance considerations. The Hytherm ECO XPS insulation was crucial in maintaining thermal values while enduring the pressures of daily foot traffic, play equipment, and sports use.

Just-in-time deliveries, careful coordination, and close collaboration between Axter, NRA Roofing & Flooring and Arkilab Design Studio ensured the project remained on track and on schedule.

Flawless Execution and Workmanship

Every stage of the installation process demonstrated an unwavering commitment to quality. Axter’s accredited contractors, trained through the company’s upskilling programmes, were equipped to handle the demands of this intricate project.

The Wilotekt-Plus waterproofing system was installed in phased stages, aligning with construction timelines and ensuring rapid, uninterrupted progress. The Hytherm ECO XPS insulation boards were carefully positioned to avoid thermal bridging and support rooftop activities.

Axter’s technical and Quality Assurance teams were on-site throughout, conducting inspections and providing real-time guidance. This resulted in a visually striking and technically flawless rooftop, delivered to the highest standards and ready for students to enjoy by the start of the academic year in September 2024.

20230717 105805

20230717 105810

Managing the Build in a Live City Centre

With minimal on-site storage and high surrounding footfall, the site team adopted an agile project management approach. Deliveries were timed to avoid congestion and organised into smaller loads to suit rooftop space constraints.

Despite working through the winter months, the project remained on schedule thanks to detailed planning and continual on-site support from Axter’s technical and QA teams. Regular inspections meant zero rework.

A Model for Future Urban Schools

The Crown Street Primary School rooftop is a benchmark for urban school design—proof that innovation, sustainability, and quality workmanship can come together to transform city-centre spaces into vibrant, high-performing environments for children.

This project not only showcases Axter’s technical capability but sets a new standard for multifunctional rooftops in educational settings.

You may also like to read...