Accessibility Settings

Text
Use dyslexic-friendly font Applies the Open Dyslexic font, designed to improve readability for individuals with dyslexia.
Use readable fonts Applies a more readable font throughout the website, improving readability.
Underline links Underlines links throughout the website, making them easier to distinguish.
Adjust text size (%) Adjusts the font size for improved readability.
Visuals
Use reduced animations Reduces animations across the website, reducing distractions and improving focus.
Use calm mode Reduces the colour saturation throughout the website to create a more soothing visual experience.
Use high-contrast mode Increases the contrast of elements on the website, making text and interface elements easier to distinguish.
BFRA SQUARE LOGO FULL COLOUR
Axter is a proud founding member of the Bitumen Flat Roofing Association (BFRA)

We are honoured to be at the forefront of this milestone for the UK’s flat roofing sector

Abbotts Avenue West

Abbots Avenue West in St Albans is a residential block of flats that required extensive refurbishment due to multiple issues.

Client
Morgan Sindall
Project type
Refurbishment
Project sector
Residential
System categories
Bitumen
Accredited Installer
HTR Building Services Ltd
IMG 20241024 WA0021

Systems in use

  • Excel®

    A premium range of high performance reinforced bitumen waterproofing membranes, manufactured with the unique Alpa polymeric binder, making it our most technologically advanced RBM system.

Project Overview

The refurbishment of the Abbots Avenue West project presented a unique set of challenges. Due to the severity of its existing roofing issues and its status as a live building with residents in situ, all parties involved needed to utilise their expertise and new technology to ensure work was completed swiftly, and to the highest standard.  

IMG 20241024 WA0019

Complexity

Axter worked closely with St Albans Council and Morgan Sindall, navigating a rigorous vetting process to be awarded the framework. Following the successful bid, an exhaustive roof survey was conducted, which included core sampling and moisture mapping. These assessments revealed extensive failures in the waterproofing system, water saturation in the build-up components, and thermal inefficiencies that required immediate remediation. The project demanded a complete roof strip and the installation of Excel reinforced bituminous membrane system and tapered PIR insulation system.  

Additional complexities arose from coordinating work in a live environment, requiring enhanced safety protocols and a quick completion of works whilst retaining high standards. With residents in-situ, it was vital to minimise the dust, noise, and waste, throughout the refurbishment process.

Solutions

Axter and HTR Building Services Ltd demonstrated exceptional workmanship throughout the Abbots Avenue West project. The installation process was meticulously planned to minimise disruption to residents and ensure quality at every stage. The roof was stripped down, with careful removal of compromised materials and precision installation of the new roofing system including Excel reinforced bituminous membrane system and tapered PIR insulation system.  

Unexpected weather conditions played their part throughout the project. With the already strict time-restrictions in place (with residents in-situ), this meant any delays to the project could cause further inconvenience. Meticulous planning meant undisrupted days were incredibly efficient, resulting in the project completing before the original deadline.

IMG 20241024 WA0013

You may also like to read...

Private — Refurbishment

East Dulwich, London

Systems in use: Ecoflex®

Private — New Build

The Baitul Futuh Mosque, London

Systems in use: Wilotekt®-Plus